The fun part of the annual budget is the capital budget, because this is the part that pays for the things that we need to have a functional and fun city.

Like the rest of the budget, our Capital Plan spending is estimated out over 5 years. We have a plan for the amount we will spend in 2024, and a plan for the entire 2024-2028 period. There is a bit of flexibility built into this, and it is necessarily front-loaded. This is because staff cannot start the procurement process for capital goods and works until it is approved by Council, but commonly the time period between getting the approval, going to procurement, buying or building the thing, and paying the invoice takes more than one year. This means that every year a large number of things planned for year 1 actually get done in year 2, or maybe year 3, so the budget line item “carries over” to those years.

Here is the briefest breakdown of our 2024-2028 capital plan (the full plan, in all its 3 page 133-line spreadsheet form can be seen starting on page 212 of this report. The longer plan, in its 33-page 433-line spreadsheet glory can be seen in this council report from January):

Note we are currently putting the final touches on təməsew̓txʷ Aquatic and Community Centre, the single biggest capital investment the City has ever made, and it is not represented in these numbers. We still plan to spend up to $152 Million on buildings, roads, pipes, and equipment this year. We will almost certainly spend less, due to the “carry over” effect described above. In my pervious post I wrote about the utility investments (sewer separation, accelerated water upgrades, advanced meter infrastructure for electrical, etc.), so I will use this space to talk about some of the highlights from the General Fund.

Massey Theatre ($19 million)
When the Massey Theatre was no longer part of the School District’s plans for a new NWSS, there was no way they could justify taking money from education programs to cover its ongoing operation and upkeep costs, so decided it had to be demolished. Driven by community demand, the City Council at the time decided to take on the theatre and protect it for future generations. At the time, an engineer report suggested it would cost $18 Million to bring the theatre up to a condition where it will last generations. Those costs are now coming due. The City is currently investing in essential repairs and upgrades to keep the building safe and address some envelope issues, and to do some internal upgrades to improve accessibility and functionality. This is not the end of the work, but the beginning.

Pavement Management ($4.15 M in 2024, $19.4 million over 5 years)
Roads are expensive to maintain. When I was first elected to Council in 2014, we spent about $2.5 Million on “pavement management”. Even this was an improvement over the $1.5 Million we spent only 5 years before. This amount has ramped up significantly over the last few years, and we are now looking at $4 Million a year on average. Note, we have not added to the number of roads, nor is there a significant increase the number of cars (though cars have gotten heavier). This increase is partly due to inflation, and partly due to us ramping up our work to get caught up and improve the overall condition. Yes, we are doing a lot of different things in the City, but rest assured New Westminster is spending more than ever before on fixing the potholes.

Sidewalks ($690K in 2024, $4.95M over 5 years)
Between replacement of sidewalks and our enhanced new sidewalk program to fill gaps and make accessibility improvements, we are investing almost $5 million in sidewalks in this plan. This does not include the $1.4 million in pedestrian crossing improvements or special projects like the $2.2 million improvements to the McInnes Overpass.

Rail crossing Upgrades ($3.6 Million)
We have money in the budget for the upgrades that will lead to whistle cessation, with Sapperton being the priority area and safety improvements in Queensborough.

Street Light improvements ($2.4 million in 2024, $4.6 million over 5 years)
Street lights are an important part of building a safe active transportation system. As we upgrade and move to LED technology, the operational cost will go down, but a significant investment is needed to upgrade aging standards, especially in the Massey Victory Height neighbourhood.

Artificial Turf Fields ($3.2 million)
Yes, we are building a new artificial turf field, once we do the Parks and Recreation Comprehensive Plan and work with community to determine the best location. We are also replacing the end-of-life turf at the Queens Park all-weather field.

QP Farm upgrades ($500k)
This project will see amendment of existing structures to facilitate new year-round community programs including retrofit of the long narrow building with new plumbing and electrical, and both gazebo structures, new picnic tables, small huts, a new wetland area and drainage infrastructure, food trees, pollinator meadow, and more. The result will be a refreshed public space for education programs around food systems, youth programming, and fun space for kids. There might even be a mushroom wall included.

Trees ($1.2 million in 2024, $2.9 million over 5 years)
We are planting a lot of trees in New West as part of our Urban Forest Management Strategy, and have been successful at getting millions of dollars from senior governments to support this program. This means more street trees, with a new emphasis on Queensborough, and a few big projects like the front lawn of City Hall.


These highlights only make up 20% of our capital plan, there is a lot there in supporting affordable housing, IT upgrades, measures to implement our community and corporate climate plans, equipment upgrades for Fire and Rescue, and boring things like backhoes and sand spreaders and roof repairs. These are investments in the things that keep a city operating.