JF asked—
Pat, what are the City of New Westminster’s policies regarding road closures that impact cycling routes? Is there a requirement for the company requesting the road closure to identify and provision safe detours for people walking and bicycling through construction zones.
This past fall and winter has seen a large number of road closures in the Sapperton area for combined sewer separation and RCH related projects, and another sewer separation project on 7th Avenue near Moody Park. The Crosstown Greenway passes through both of these areas.
Many, many times over the past few months I have encountered road closures on the Crosstown greenway or connecting streets that I utilize. Most of these closures have little in the way of advanced warning and any detours in place don’t have cycling or walking in mind – ie being detoured down an alley onto Braid Street – FUN!
I’m a daily bicycle commuter passing through New West to/from my place of work in Burnaby and easily fall into the capable/confident category of rider. I don’t have any problem being detoured onto Braid or 8th Avenue and cycling alongside traffic moving at 50+km/h, but for a new or less confident rider I could easily picture them saying “forget it. I’m taking the car.” Not exactly the goal for any Active Transportation minded community.
To answer your first question, the City’s policy is that road closures caused by road/utility works are required to be well signed, and that safe alternate routes for all users including cyclists and pedestrians are to be maintained at all times. What you have discovered is that the policy sometimes fall short in practice. This is something I have spent much time ranting about in the past. It is a perennial problem, one that is (hopefully) getting better, but is (admittedly) a work in progress.
There is a *lot* of roadwork going on right now in New West. As you surmised, much of it is related to a sewer separation program accelerated somewhat by winning a federal grant to help pay for some of it. The situation in lower Sapperton has been especially intrusive, as that is where the sewer separation work is most intense along with utility works related to the expansion of the Hospital.
Almost all of this work is done by contractors (a city the size of New West doesn’t really have staff to do works at this scale anymore), and requirements to maintain rights of way and accommodate all types of road users are written right into the tender documents. They hire road flagging crews, do traffic plans, our engineers sign off on those plans, and our engineers sometimes drop by the site to see how things are going. However, these jobs are complicated and worksites are dynamic, so maintaining 100% access is difficult, and traffic plans necessarily shift as the project requires. This is often when the best laid plans get set aside for a bit, and people are inconvenienced. Sometimes, of course, they simply don’t care. Either way, the City needs to be let know.
Often, it results in a call to the Engineering Department or a SeeClickFix entry, an e-mail to a Councillor, or my better half bending my ear over dinner (if it impacted her riding route to work, like it did on 13th Ave last month). This usually means one of our engineering staff goes out there, sees what the situation is, and the contractor (if they haven’t already) are told to make it right.
This is, unfortunately, the reality of this type of work. I simply don’t know how to make it better.
I say that as someone who rides bikes around this city all the time, but I also say it as someone who at one point in his life got paid to stand with a hardhat next to an excavator or drill rig with flagging crews protecting me from traffic and vice versa. Any time you are interacting with heavy equipment, public streets and underground utilities, there are unpredictable conditions you encounter, and you need to make adjustments to plans on the fly, and the impact on traffic is but one (important) aspect of your contingency plans.
I was actually compelled early in the year to drop by the upper Sapperton project when I received two separate compliments from cyclists I know about how well the flagging personnel managed two different conflict situations with a bike route. This seriously never happens – I never get people pointing out when something goes good – so I had to check it out and let the Director of Engineering know. That said, I have also gone through lower Sapperton in the last couple of weeks, and have found through-signage lacking at times.
This is all to say I think we are doing better that we used to on this, as we have updated our policies. Our Engineering Department requires that cycling access or alternate routes must be part of the traffic plan, and that safe pedestrian access routes must be considered prior to starting work. At the same time, it still happens that I run into road works with no warning, and little indication of how I am supposed to route around them.
My best advice, when this happens, is to contact our engineering operations desk (604-526-4691 or engops@newwestcity.ca) and tell them about your experiences. We don’t have engineers on site every moment of the project, and if they don’t know there is a problem, they cannot address it. You can contact me as well, but I’m just going to contact Engineering Operations anyway, so you can cut out the middle man.
If you are into filling out web forms (you got here, didn’t you?) you can also use the SeeClickFix App to report these issues, with the bonus of being able to track how staff respond to them.
Making a complaint to Engineering may help in the short term, but it also helps longer-term. There are a limited number of contractors who do this type of work in the region, and a contractor that receives complaints about their inability to manage our traffic and access requirements is one we are less likely to hire for future contracts. Their ability to address traffic access is part of the quality assessment staff need to do at the end of every contract. That is, ultimately, the only way we will get better compliance.
I just want to say one more thing. This situation is frustrating at the time, but please try to be kind to the persons holding the Stop/Slow paddles at the worksite. Their job is surprisingly difficult and stressful. They often work in terrible conditions (noise, dust, weather, silly hours), and have to deal with irate drivers, angry neighbours and demanding construction managers, while carrying the responsibility of keeping the public and the workers on the site safe – often by putting themselves in dangerous situations. They know you are frustrated, they have little control over the hazards they are protecting you from, they honestly want to get you on your way as quickly and safely as they can.
Thanks Pat. I appreciate the prompt response. I know it’s a challenge to manage road closures, but I don’t think we’re doing enough to safely detour vulnerable road users around construction sites. A few days after I submitted the question, Sherbrooke was closed at Columbia to all traffic forcing cyclists onto a stretch of Columbia that does not have bike lanes (Sherbrooke to Braid). Yes, the speed limit is only 30km/h, but a person riding a bicycle would have to be comfortable riding in traffic to avoid the door zone of the on-street parking.
As for the SeeClickFix app – I’m sure it works great, but I ride through 4 communities every day. I’m not installing 4 different apps, let me know when the MetroVancouver version comes out and I can use one app to report an issue to any of the 21+ civic governments or the regional authority :).
Jason F: SeeClickFix app works in in most of the lower mainland. New West, Vancouver, Burnaby, Coquitlam, Delta and Surrey for sure.