Ask Pat: Permit times

Someone asked—

I am a rental tenant at [redacted to protect privacy – a downtown Strata building]. I have heard our Strata is considering dissolution & sale of our building to developers. How long does a demolition process take per the City of New West’s permit(s) process etc.?

This is really not a question I can answer with certainty, because I am not involved with these kind of front-counter operations. The short version of your answer is that a Demolition Permit can probably take less than a day or several months (depending on things like the need for hazardous material surveys, Environmental Site Assessments, and safe disconnection from City utilities) but it isn’t the Demolition Permit timing that would necessarily be a limiting factor here.

It sounds like the feeling in your building is that the current building will be demolished and a replacement building built. I suggest that, if this was the case, a new owner would not apply to demolish the building until they had a certainty that they would be permitted to build a replacement on the site. That would likely require a Development Permit, and may even require a Rezoning or an Official Community Plan amendment, depending on what the owner wishes to build. The more of these you add, the more time it takes to get through the process. Those processes also include extensive public consultation, and would likely result in a Public Hearing. All told, these processes can take a year or more. The more complex the project and the more it varies from existing land use, the more complicated and time-consuming these applications go. It is also possible that a developer’s proposal will not be found acceptable by City Policy or by whim of Council, so the wait an be literally endless.

That said, I have no idea what process your building will have to go through, nor do I know what the new owner would plan to build. No application for your address has come to City Council yet. I did a quick scan of the Land Use and Planning Committee agendas for the last year, and don’t see it mentioned there at all (as a preliminary step, any application would likely go to LUPC before it came to Council). I also checked the on-line “Projects on the Go” table, and see no reference to your location, so I am pretty sure no formal application has been made to the City.

In researching your answer, I stumbled upon a report that I am a little reluctant to link to, because it was authored by an organization that has a long reputation of producing dubious reports using sketchy research methods. But for that it is worth, a third party with no reason to make a progressive city like New Westminster look good found that we are comparatively quick in getting new buildings through the approval process. They found that our staff and process are able to process applications faster than most Municipalities in the Lower Mainland: generally in the top 3 or top 5 in the region (depending on the application type). They also found we had among the lowest “Costs and Fees” for a typical application (those fees are ideally set to act as cost recovery). I started by saying I am somewhat separated from front-counter activities at the City, so none of this credit goes to me, but kudos to our great professional staff!

So, in summary, if you are curious about redevelopment plans for your apartment, keep an eye on the City’s LUPC Agenda and the “Projects on the Go” list. Also remember, as a renter, you have rights under the Residential Tenancy Act, including appropriate notice and compensation for being evicted. If you have questions, you should contact those professional staff in our Planning Department. They almost certainly know more than I do. Good luck!

One comment on “Ask Pat: Permit times

Leave a Reply